www.bpsolar.fr Plan du site   |  Contacts   |  Offres d'emplois   |  Accueil
 
Training
Installation
 

Foreword

Summary of components to be fitted and wired:

  • Energy management and control cabinet.

  • Continuous, alternating energy conversion inverter.
  • Battery charger to provide a back-up
        charge using an auxiliary source.
  • An alternating distribution and metering box.
  • N.B.: In certain installations, specific equipment may contain a variety of functions
    (e.g. COMBI Inverter, which includes a charge function).

    Positioning the energy management and conversion equipment

    For safety reasons, the energy management and conversion equipment must be placed outside the battery storage area.
    You are also advised to keep this equipment away from houses. We recommend that the length of the Battery/Cabinet cable should be kept to a minimum (less than 6m).

    Next >

    L'énergie est notre avenir, économisons-la !
    © 2003-2007 BP Solar    |   www.bpsolar.com  |   www.bp-france.com